ROV-based drilling down into rock on the seabed for anchors, bolts and foundations.

ROV-based drilling directly into rock on the seabed for anchors, bolts, foundations and other subsea installations.

The ROV is set down over the drilling point and drills vertically into the bedrock, so attachment points are established in solid rock rather than in loose seabed material.

Vertical drilling and bolt installation in one operation

The same ROV spread drills the hole and installs the bolt, so drilling, bolt installation and grouting are handled in a single subsea operation with video documentation.

NorClean has installed more than 500 subsea bolts across smaller and larger operations, including aquaculture mooring at Flekkefjord and drilling at Vikane.

Both directions from the same ROV platform

Tooling is configured per job, so the same work-class ROV covers vertical drilling into the seabed and horizontal drilling into rock faces.

Discuss the project

Execution

THE OPERATION, STEP BY STEP

  1. 01

    Position

    Position the ROV and drilling system.

  2. 02

    Drill

    Drill the required hole into the subsea rock.

  3. 03

    Inject

    Inject grout where required.

  4. 04

    Install

    Install bolt, anchor or required infrastructure.

  5. 05

    Secure

    Complete and verify the installation.

Contact

LET'STALKSUBSEA.

Tell us about your project, location and operational requirements.

Direct

907 30 972post@nclean.no

NorClean Technology AS
Oldernesveien 17, 5163 Laksevåg
Bergen, Norway